WYRM MEP
Agentic M&E design + coordination, checked by deterministic engines
An MFSD is relocated on level 3 — WYRM reconciles the auto-spec against the auto-schedule and cascades the consequences across disciplines.
Change detected: MFSD-L3-07 relocated 2.4 m east (model delta vs locked spec)Consequence: 3 power supplies realigned · DB-L3-B breaker 20 A → 25 A↳ BS 7671 cable check re-run on the affected circuit — PASS (volt-drop 1.9%)Spec ⟷ schedule: 2 untracked deltas reconciled · 1 flagged for the engineerTasks raised: 4 (2 complete · 1 in progress · 1 outstanding) — tracked to RIBA Stage 4Calc pack attached · advisory only — awaiting named-engineer sign-off