DB-2 submain: volt drop
Recomputed 5.8% at the board: over the example 5% target
BS 7671 App 4, Table 4Ab
Uprate the submain 70 → 95 mm² (4-core SWA)
holds Ib = 184 A over the 38 m run at 4.3% volt drop
Agentic MEP / Design QA and recommendations
Find the issue, recommend a calculated correction and apply the reviewed change across drawings, schedules and documents.
Explore the workflowEngineering review
See why a result needs attention and what to change. WYRM brings the recommendation back into the calculation and follows the impact across the design, ready for your engineer to review.
Illustrative review. Apply the recommendations to see the result.
Output under review
A separate engine recalculates every result. The maker never marks its own work.
Recomputed 5.8% at the board: over the example 5% target
BS 7671 App 4, Table 4Ab
Uprate the submain 70 → 95 mm² (4-core SWA)
holds Ib = 184 A over the 38 m run at 4.3% volt drop
Selectivity holds across the affected ways
BS 7671 §536.4
Checks each output against its governing standard and that the change cascade left no discipline unchecked.
1,200 l/s = 8 l/s·person at the revised 150 occupancy: below 10
Approved Doc F · BS EN 16798-1
Raise AHU-1 supply 1,200 → 1,500 l/s
10 l/s·person for the revised occupancy; duct velocity stays < 6 m/s
Layout change propagated to 2 downstream disciplines, both checked again
Project Terminal
Each recommendation includes the reason for the change and the supporting inputs. The calculation pack stays with the result. Your named engineer reviews and signs.
Check inputs, units, assumptions and the requirements used for the calculation. Keep the result connected to the project evidence so a reviewer can understand how the conclusion was reached.
Bring attention to results that fall outside the relevant criteria or need further information. Separate a calculation problem from a missing input so the engineer can address the actual cause.
Present the proposed correction with its reason. A recommendation might change a cable selection, revisit an airflow rate or resolve a coordination conflict. The engineer decides whether it is suitable for the project.
Review the result after the change and follow its consequences into related disciplines and deliverables. Keep the reviewed calculation, schedule and model information aligned before issue.
Example workflow
Yes. The workflow brings the finding together with a proposed correction and the engineering context needed to assess it. The interactive example shows how that review can work.
The engineer retains the decision. Proposed changes are reviewed before they are applied to the design and issued as part of the project information.
Work with WYRM
Available through a pilot for UK building services teams.