Agentic MEP / Schedule creation
Turn design information into MEP schedules
Create equipment schedules with calculated duties, selected sizes, manufacturer references and coordinated locations.
Explore the workflowChoose the deliverable
Establish the equipment or design schedule needed for the project. Define what each row represents and which references, units and values the reviewer needs to see.
Bring the information together
WYRM fills the schedule with calculated duties, selected sizes, manufacturer and product references, electrical requirements and locations. Each entry follows the same equipment information used in the drawing and specification.
Review the design values
Check the schedule against the calculations, drawings and specification. Review missing information and assumptions before the table is treated as an issued design deliverable.
Prepare for the next stage
As the project moves towards delivery and handover, asset and equipment information becomes increasingly important. Connect schedule preparation with the requirements for COBie data and other project deliverables.
Example workflow
Prepare an air handling unit schedule
- Start with
- Equipment references, serving areas, design airflow and the agreed performance requirements.
- Work towards
- Organise each unit and its design values into the required columns. Check references against the drawings and specification, with outstanding information visible before issue.
Working with your team
Are these construction programme schedules?
This workflow concerns MEP equipment and engineering schedules. It organises design information, equipment references and values for the project deliverable.
Can we agree the schedule layout?
Bring the schedule your team needs to the pilot discussion. The required columns, data sources, review steps and output format form part of the workflow definition.
Work with WYRM
Bring your next engineering workflow.
Available through a pilot for UK building services teams.