Skip to content

Agentic MEP / Lighting and daylighting

Design lighting around the room and the task

Calculate lighting and daylight performance, draw luminaire layouts using manufacturer photometric data, and coordinate the ceiling services.

Explore the workflow

Establish the lighting brief

Set out room uses, task areas, working planes, operating hours and the project lighting criteria. Bring the reflectances, glazing and obstructions into view so the calculation represents the space being designed.

Assess illuminance and uniformity

Calculate illuminance and uniformity using room geometry, surface assumptions and manufacturer photometric data. WYRM develops the luminaire selection and spacing and draws the lighting layout, keeping the calculation basis with the design.

Review daylight and glare

Consider daylight contribution, orientation and glazing alongside electric lighting. Investigate glare and contrast where occupants work, and compare layout, shading and control options as the design develops.

Recommend and coordinate changes

An issue should lead to a useful next action: adjust luminaire spacing, revisit a fitting selection or review solar control. Carry the decision into the lighting layout, luminaire schedule and specification, then coordinate it with ceilings and other services.

Example workflow

A revised workspace layout

Start with
A floor plan, desk arrangement, ceiling heights, glazing information and the lighting brief.
Work towards
Review task illuminance and uniformity for the revised arrangement. Compare fitting positions, examine daylight and glare, and prepare a coordinated luminaire schedule for engineering review.

Working with your team

Does lighting design connect to Drawing Studio?

Room geometry and room use give the lighting assessment its context. Drawing Studio brings spaces into view so the team can check the layout and coordinate lighting with other services.

Can daylighting be considered alongside thermal modelling?

Glazing affects daylight, glare and solar gains. Bring those linked questions into the design review so a lighting decision can be assessed alongside comfort, cooling demand and energy use.

Work with WYRM

Bring your next engineering workflow.

Available through a pilot for UK building services teams.

Discuss a pilot