Agentic MEP / Specification writing
Write MEP specifications around the project
Populate MEP specifications from the calculated design, coordinated services and manufacturer product information.
Explore the workflowEstablish the requirements
Start with the project brief and the requirements that govern the work. Make the discipline, system and intended outcome clear before drafting the specification content.
Develop the specification
Populate the clauses with calculated duties, selected equipment and manufacturer installation requirements. Reference the relevant product information and carry project decisions from the coordinated layout into the written specification.
Check the clauses
Review the draft with the engineer responsible for the design. Resolve assumptions and project choices, check source references where used, and agree the content before issue.
Read it with the schedules
Specifications and schedules describe different parts of the same design. Bring both into the review so equipment information and written requirements can be checked together when the project changes.
Example workflow
Develop a ventilation specification
- Start with
- The ventilation strategy, room requirements, equipment selections and the project brief.
- Work towards
- Draft the system requirements, installation provisions and commissioning information together. Resolve the project choices with the engineer and check the clauses against the equipment schedule.
Working with your team
Can this cover our particular specification?
The pilot is organised around your team's requirements and the specification you need to produce. Use the pilot discussion to establish the discipline, source material, document structure and review process.
How does agentic MEP help with writing?
It connects document preparation with the engineering task and the information available for the project. Your team reviews the resulting content and retains responsibility for the issued specification.
Work with WYRM
Bring your next engineering workflow.
Available through a pilot for UK building services teams.